Retrofit, Hot water boiler 8 MW, Alajärvi 2019
Improvement of the boiler combustion and efficiency.
See below the latest examples of our services.
Improvement of the boiler combustion and efficiency.
Laholm Sweden, hot water plant 4 MW Komforts, Adven
E&I supervision and commissioning services, Valmet LDA, Portugal
E&I supervising and commissioning services, Valmet AB, Sweden
Project, Site, E&I and Plant Management, 740 MWth / 274 MWe, Listrindo Power Company / ÅF-Consult
Overall Site Management for the whole Coal Fired Power plant construction works from greenfield to commissioning
Boiler design, 6,7 t/h, 440C, 36 bara, West-Ter, Russia, 2016
Boiler design, 6 MW steam BFB boiler 203.4C, 16 Barg, Estonia, 2016
Boiler design, 33MW, membrane / fire tube boiler for industrial area heating system.
Project Management, 130 MWe Frame 9 E, PT Cikarang Listrindo, Indonesia.
EPCM, 740 MWth / 274 MWe, 2 x Frame 9 E CCGT plant, PT Cikarang Listrindo / ÅF-Consult, Indonesia.
Grate fired boiler 3 MW, Factory of Taali, Finland, 2011